A colony on a ditch
Everything about early Scottsdale ran through one structure most of its settlers never saw. The Arizona Canal, dug in 1883–85, took its water from a wooden diversion dam on the Salt River a few miles above where Granite Reef Dam stands today, fourteen feet of timber crib and rock fill that turned the river’s flow into the ditch that reached the benchland north of Phoenix. Winfield Scott’s 640 acres sat on that ditch. His citrus, his figs, the alfalfa and barley of the families he was recruiting: all of it depended on a dam that had been built to work in an ordinary year.
February 1891 was not an ordinary year. Warm rain fell on heavy snowpack in the Salt and Verde watersheds, and the river came down the canyon at a scale no one in the Valley had a number for. Early on the morning of February 18 the Salt was a foot and a half over the Arizona Dam. Hours later it was five feet over. By the morning of the 19th the water was running some eighteen feet deep across the spot where the dam had been, and the dam was simply gone, carried downstream in pieces. Below Phoenix the river spread three miles wide, took out the railroad bridge at Tempe, and put the south side of the territorial capital under water. When the crest finally receded, the river rose again on the 24th, this time to an estimated 300,000 cubic feet per second: the largest flow ever recorded on the Salt, before or since.
The dam that failed
The structure the river took was six years old. When William J. Murphy’s crews finished the Arizona Canal in 1885, its head was the Arizona Dam, a timber crib filled with rock, set a little over two miles upstream of the granite outcrop where Granite Reef Dam stands now. It was built to turn an ordinary river, and for six seasons it did. After the 1891 flood it was rebuilt, and it was the canal’s head for another seventeen years, until spring floods in 1905 wrecked it badly enough that irrigation under the Arizona Canal was judged impossible. The Reclamation Service then built the concrete weir at Granite Reef, and on June 13, 1908, Governor Joseph H. Kibbey opened its Arizona Canal headgates. The river has been diverted there ever since.
The Valley around the flood
Scottsdale in February 1891 was barely a place. Winfield Scott was still splitting his time with the Army chaplaincy, Helen Scott ran the ranch, and the home nursery was selling orange and lemon trees by the thousand at 60 to 70 cents apiece. That same year Frank Titus took up 160 acres about three miles south, where his 1892 farmhouse, the Titus House, still stands on Hayden Road. In Phoenix the flood took the territorial fair’s buildings and racetrack, and the fair went dark until 1905. The Salt River had shown both of its faces in one decade, and the Valley spent the next one learning to store it.
What the settlement learned
The immediate consequence for the Scott colony was a dry canal in the middle of the growing season, until the dam could be rebuilt. The larger consequence took a decade to work out. The valley’s farmers had already known that the river could fail them by running low; 1891 demonstrated that it could also fail them by running high, and that the private canal companies had neither the capital nor the engineering to build anything the Salt could not destroy. The only durable answer was storage: a dam in the mountains that would hold the floods and release them in the dry months, and no local investor could afford one.
That argument, made over and over through the drought years that began in 1898, is what sent the Salt River Valley to Washington. It produced the Reclamation Act of 1902, the farmers’ pledge of their own land as collateral in 1903, the Salt River Project that grew from it, and Roosevelt Dam in 1911. The 1891 flood is where the case begins. The rest of the year is at 1891, and the founding decade runs through the 1890s chapter.