Skip to content
More than just the tips. Start here
Scottsdale.tips
Land & Growth The City of Scottsdale First General Plan 1967 · General Plan 2035 ratified 2021 Why zoning is the main arena of Scottsdale politics

Scottsdale's General Plan and Zoning: How Land-Use Decisions Really Get Made

Arizona requires Scottsdale to keep a General Plan, the city's long-range blueprint, and to put each new one to voters. General Plan 2035 was ratified in November 2021 with about 52% of the vote. Below it sit area plans such as the Old Town Character Area Plan, a zoning ordinance, and boards that recommend, review design and grant variances before the council makes the final call on rezonings.

Illustration for The General Plan & Zoning: why zoning is the main arena of scottsdale politics, The City of Scottsdale

The 30-second version

  • State law makes Scottsdale adopt a General Plan, readopt or replace it at least every ten years, and send each new plan to the voters for ratification.
  • General Plan 2035, adopted by the council on June 8, 2021, was ratified by voters on November 2, 2021, 28,488 to 25,942, about 52.3% to 47.7%.
  • The Planning Commission recommends on rezonings and plan amendments; the Development Review Board rules on design; the Board of Adjustment hears variances; the council has the final say on rezonings.
  • North Scottsdale builds under the 1991 Environmentally Sensitive Lands ordinance, which makes developers leave a share of each site as natural desert.
  • Arizona's Prop 207 (2006) means the city can owe compensation if a new rule cuts a property's value, which is why Scottsdale rarely downzones.

What it means in Scottsdale

Scottsdale has no council districts and no party labels, so its politics collect around land: how tall Old Town can grow, where apartments go, how much desert a subdivision must leave alone. Nearly every one of those fights runs through the same machinery, a voter-ratified General Plan, a zoning ordinance, advisory boards and a final council vote, and residents who lose at the council can petition a rezoning onto the ballot. Learning how a zoning case moves is the single most useful thing a new resident can do to follow local politics.

Who’s in charge

City council, advised by the Planning Commission and Development Review Board

Where

Scottsdale Civic Center (council meets in the Kiva)

Official source

scottsdaleaz.gov ↗

Topic

Land & Growth

Established

First General Plan 1967 · General Plan 2035 ratified 2021

Read

The story behind it

The short version

In most cities zoning is a technical sideline. In Scottsdale it is the main event. The city sells its looks, low buildings, clean roadsides, desert right up to the curb, and residents treat every proposal that might change them as a referendum on what Scottsdale is. So the process that decides what gets built is also the process that decides most local elections. Candidates run on height limits and apartment counts the way candidates elsewhere run on potholes.

That process has layers. At the top is the General Plan, the city’s long-range blueprint, which Arizona law requires and which voters must ratify. Below it are character area plans that apply the blueprint to places like Old Town. Below those is the zoning ordinance, the enforceable rulebook that says what each parcel can hold and how tall it can be. And running through all of it are appointed boards that hold hearings before the elected council decides.

Who does what

The Planning Commission, seven residents appointed by the council, holds the first public hearing on rezonings, General Plan amendments and use permits and makes a recommendation. It advises; it does not decide.

The Development Review Board judges design: architecture, site layout, landscaping and residential plats. Its seven members are one council member, one planning commissioner and five residents with design or development experience. This is the board that makes a drugstore look like Scottsdale.

The Board of Adjustment hears requests for variances, relief from a standard such as a setback when a lot has an unusual hardship, and appeals of staff decisions.

The council has the final say on every rezoning and General Plan amendment. A major plan amendment needs a two-thirds vote, five of seven, under state law. And because a rezoning is an ordinance, residents who lose can take it to the ballot by referendum.

General Plan 2035

Arizona’s Growing Smarter laws of 1998 and 2000 required cities to update their general plans and put each new one before voters. Scottsdale’s first plan dates to 1967; its first voter-ratified plan, General Plan 2001, passed on March 12, 2002. The council adopted General Plan 2035 on June 8, 2021, and voters ratified it that November 2 as Proposition 463, 28,488 to 25,942, about 52 percent. Voters had said no once before. On March 13, 2012 they rejected General Plan 2011, Prop 430, 13,988 to 12,924, with 18.49% turnout. In the city pamphlet the Chamber argued that the plan kept 70% of the city’s land as open space; Councilman Bob Littlefield, leading eleven arguments against it, said it “weakens the General Plan through language that encourages special interests to exploit Scottsdale’s unique character.” General Plan 2001 stayed in force until 2021. The state also makes the council readopt or replace the plan at least every ten years.

The plan has 24 elements, the state-required ones plus locally created chapters such as Character and Design. It also maps areas for character area plans, of which seven are adopted: Cactus Corridor (1992), Shea Area (1993), Desert Foothills (1999), Dynamite Foothills (2000), Greater Airpark and Southern Scottsdale (both 2010) and Old Town (2018). The city’s list says General Plan 2035 designates twenty-four areas meant to have such plans, so seventeen are still unwritten.

State law also requires a yearly status report to the council, and the first four reports on General Plan 2035 show a plan amended only in small steps: no major amendment was submitted in 2022, 2023, 2024 or 2025. The 2022 report lists fourteen zoning actions and eight minor amendments, one of them a text change to meet House Bill 2482, which since September 24, 2022 has required a major amendment to be heard within twelve months of its proposal rather than in the same calendar year; the biggest rezoning was Optima McDowell Mountain Village (1,390 homes, up to 118 feet, about 22 acres, November 21, 2022). The 2023 report lists twelve zoning actions, including the historic designation of City Hall (June 13) and The Parque in the Airpark (about 1,322 homes and hotel rooms on about 32 acres, November 13), and one minor amendment, Phase 1 of the Old Town Character Area Plan update (October 24). The 2024 report lists twelve zoning actions, among them Axon’s mixed-use plan (about 2,552 apartments, a hotel and retail on about 41 acres, November 19) and an update to the Fairmont Scottsdale Princess master plan adding guest rooms (December 4), and five minor amendments, the first Phase 2 of the Old Town plan update (February 2).

The 2025 annual report lists five rezonings approved that year, among them Artessa (47 homes on about 8.6 acres, June 24), Palm Lane Residences (22 detached units, July 1) and Ranch Gate 40 (a 32-lot subdivision on 40 acres in the Dynamite Foothills, September 30), and one minor plan amendment, for the Collector’s Garages at WestWorld (August 26); no major amendment was submitted. The bigger changes came from the state. To meet new laws, the council rewrote the city’s rules for accessory dwelling units (HB 2928) on September 30, 2025 and for middle housing (HB 2721) on November 17, 2025, allowing duplexes to fourplexes on qualifying single-family lots within a mile of Old Town and in parts of larger new developments, ahead of the January 1, 2026 deadline.

The desert rules

North of the older city, development follows the Environmentally Sensitive Lands ordinance, adopted in 1991 for roughly 134 square miles of desert and mountain terrain. It makes each project set aside a share of the site as permanent natural open space and protects washes, boulders and peaks. It built on the 1981 Native Plant ordinance, which protects large saguaros and native trees. Along designated scenic corridors such as Pima Road, Dynamite Boulevard and north Scottsdale Road, deep natural-desert setbacks keep the roadsides open. The North Scottsdale you drive through is largely these rules made visible.

Taste as policy

Scottsdale’s design culture came early. In 1962 the new charter council, a few months after voters approved the charter on October 31, 1961, stopped new billboards; existing ones stayed until a sixteen-year sign fight and redevelopment removed them. The 1960s politics chapter traces what followed: the Design Review Board of 1965 and the citizen planning committees of the STEP program that fed the first General Plan. The instinct that the view is the product, and the city should protect it, runs straight through to the ESL ordinance and the Preserve.

The height fights

Height is the oldest of these fights. A 1964 amendment allowed high-rise zoning to 120 feet, and in November 1970, after a citizen committee asked for the high-rise district to be struck, the council voted 6 to 1 for a 60-foot maximum, the city’s historic context says. No zoning question has been hotter in the 2020s than height in Old Town. On July 2, 2018 the council adopted the Old Town Character Area Plan, Resolution 11181, 7 to 0, minus one policy, and passed the matching zoning text amendment, Ordinance 4355, by the same vote; Councilman David Smith’s motion to confine the tallest zoning type to a single site died for lack of a second. By the city’s own planning account, the plan raised allowed heights in parts of downtown from 90 to 120 feet and widened the areas where buildings of up to 150 feet could be requested. Supporters saw it as the way to bring residents, offices and hotels downtown; opponents saw a skyline that would not look like Scottsdale.

The test case was Southbridge Two, a 10-acre redevelopment of much of the Fifth Avenue shopping district with buildings up to 150 feet along Scottsdale Road and the canal. The council approved it 4–3 on December 4, 2019. Opponents gathered about 17,000 referendum signatures, and on April 7, 2020, the council repealed the approval 4–3 at the developer’s request rather than send it to voters. The episode showed both sides how the system works: the council decides, but a referendum petition can freeze a decision, and the threat of one shapes what developers propose. The same arguments over height and density ran through the 2021 General Plan vote and the 2024 mayoral race.

The state’s limits

Scottsdale writes its own zoning, but inside state law. The biggest constraint is Proposition 207, the Private Property Rights Protection Act that Arizona voters passed in 2006 with about 65%. If a city adopts a land-use rule that lowers the value of property someone already owns, the owner can claim compensation, or the city can waive the rule for that parcel. The practical effect is that Arizona cities rarely downzone. Scottsdale can say no to a rezoning request, but it cannot easily take away what a parcel already allows. That is why the fights happen at the rezoning stage, and why the legislature’s growing appetite for overriding local rules on housing, short-term rentals and other land questions, covered in the preemption guide, matters so much here. To take part yourself, the taking part guide explains how to speak at a hearing or apply for a board seat.

Connected guides on this site

The other layers of government, the people and the places this story runs through.

Organizations in the story

The institutions whose profiles run through this page.

The General Plan & Zoning by the numbers

52.3% yes (2021)

General Plan 2035 vote

24

Plan elements

7 adopted

Character area plans

1991

ESL ordinance

The timeline

  1. 1962

    The new charter council adopts a comprehensive zoning ordinance and stops new billboards, the start of the sign and design-review codes that shape the city's look.

  2. 1967

    Scottsdale adopts its first General Plan in July, seven years after the council rejected a county-drafted plan, the same year it annexes McCormick Ranch and opens its municipal airport. In November voters give the city express charter power to adopt a comprehensive plan.

  3. 1971

    A Planned Community District zone for master-planned developments is created, and McCormick Ranch is the first to use it, the city's historic context says.

  4. 1973

    On April 10 voters give the city charter power to require developer fees and dedications, architectural and site-plan review, and specific plans.

  5. 1976

    The Northeast Area Plan draws a 'future development line' north of the CAP canal.

  6. 1977

    The Hillside ordinance draws a no-development line on the McDowell slopes on November 15; the Court of Appeals voids it as a taking in 1985.

  7. 1981

    The Native Plant ordinance begins protecting large native cacti and trees on development sites.

  8. 1991

    The council adopts the Environmentally Sensitive Lands ordinance for the desert and mountain areas of the north, replacing the voided Hillside ordinance.

  9. 2002

    Voters ratify General Plan 2001 on March 12, the first plan passed under the state's Growing Smarter rules.

  10. 2012

    On March 13 voters reject General Plan 2011, Prop 430, 13,988 to 12,924, so General Plan 2001 stays in force until 2021.

  11. 2018

    On July 2 the council adopts the Old Town Character Area Plan, 7 to 0. By the city's account it raises allowed heights in parts of downtown, setting off years of height fights.

  12. 2020

    After a referendum petition forces Southbridge Two toward a public vote, the council repeals the project's zoning 4–3 at the developer's request.

  13. 2021

    Voters ratify General Plan 2035 on November 2, 28,488 to 25,942, about 52%.

  14. 2022

    The first annual report on General Plan 2035 lists fourteen zoning actions and eight minor plan amendments, with no major amendments submitted; the largest, Optima McDowell Mountain Village, allows 1,390 homes and buildings up to 118 feet on about 22 acres in the Airpark.

  15. 2023

    The council designates City Hall a historic property (June 13), approves Phase 1 of the Old Town Character Area Plan update (October 24) and rezones about 32 acres in the Airpark for The Parque, about 1,322 homes and hotel rooms (November 13).

  16. 2024

    Phase 2 of the Old Town plan update is adopted (February 2), and the council rezones about 41 acres at the Axon site for about 2,552 apartments, a hotel and retail (November 19); the year has twelve zoning actions, five minor amendments and no major ones.

  17. 2025

    The council amends the zoning ordinance to meet new state laws on accessory dwelling units (September 30) and middle housing (November 17); the year's annual report lists five rezonings and one minor plan amendment, with no major amendments submitted.

Questions people actually ask

What is the Scottsdale General Plan?

The city's long-range policy blueprint for land use, growth, transportation, open space and character. The current version, General Plan 2035, has 24 elements. It guides rezonings and capital spending, and Arizona law requires each new plan to be ratified by voters.

Did Scottsdale voters approve General Plan 2035?

Yes. The council adopted it on June 8, 2021, and voters ratified it as Proposition 463 on November 2, 2021, with about 52.3% voting yes.

Who approves a rezoning in Scottsdale?

The city council. The Planning Commission holds a public hearing first and makes a recommendation, and design details go to the Development Review Board, but only the council can change a property's zoning.

What is ESL zoning in Scottsdale?

The Environmentally Sensitive Lands overlay, adopted in 1991, covers the desert and mountain areas of the north. It requires development to keep part of each site as permanent natural open space and protects washes, boulders, native plants and ridgelines.

How do I get a variance in Scottsdale?

Apply to the Board of Adjustment, which hears requests for relief from zoning standards such as setbacks. State law and the city's rules require showing special circumstances about the property itself, not just a preference, and the board needs four votes to grant one.

Can residents overturn a Scottsdale rezoning?

Yes. A rezoning is a council ordinance, so residents can gather referendum signatures to put it on the ballot. The 2019 Southbridge Two approval in Old Town was forced toward a vote that way before the council repealed it in 2020.

The laws enforced here

Vernacular & Lexicon The General Plan, in the lexiconInitiative, referendum and recall, in the lexiconDynamite Boulevard / Rio Verde Drive, in the lexiconThe CAP, in the lexiconThe Airpark, in the lexiconThe Princess, in the lexiconCharter city and home rule, in the lexiconHOA, in the lexicon

Sources

Facts checked: September 22, 2026 • Sources updated: October 29, 2026 • Written by • Plain-English explainer, not legal advice. Figures follow the city charter, Arizona statutes and official records; office holders change with each election. Corrections are welcome.

The weekly letter

Scottsdale, once a week, from a local

What opened, what closed, what to book and why, and the month ahead. One email a week, free, and one click to stop.

Free, and one click to stop. Signing up makes an account, which is an email address; the privacy notice says what it keeps.